CC Duration II
| |
---|---|
Decreases CC Duration by 5%. | |
Power Cost: 1 | Utility Rank 1 |
CC Duration II is a rank 1 Utility AMP.
CC Duration II
| |
---|---|
Decreases CC Duration by 5%. | |
Power Cost: 1 | Utility Rank 1 |
CC Duration II
| |
---|---|
Decreases CC Duration by 5%. | |
Power Cost: 1 | Utility Rank 1 |
CC Duration II is a rank 1 Utility AMP.